Project overview and schedule


Contract Period: From JFY2012
■From JFY2012 to JFY2015: Preparatory work including the design and construction of the facilities, drilling of injection wells, establishment of the monitoring system and preparation for demonstration operation was carried out.
■From April 2016 to November 2019: CO2 injection and monitoring of CO2
On November 22, 2019, the target of 300 thousand tonnes of CO2 injection was achieved, and injection was terminated.
■From November 2019: Post-injection monitoring, maintenance of facilities, improvement of capability, etc.
■From JFY2021: Study/preparation of the interoperation of CCS and CCU